A) the assignment method
B) Johnson's rule
C) the CDS algorithm
D) the appointment method
E) the reservation method
Correct Answer
verified
Multiple Choice
A) the sequence of work
B) which workers are assigned to each work center
C) the time required for each item
D) the capacity of each work center
E) the availability of each work center
Correct Answer
verified
Multiple Choice
A) the row for Job 1 contains the values 5,6,and 0.
B) calculations are complete,and the problem is ready for an optimal set of assignments.
C) the column for Machine B indicates that it should be retired.
D) Job 1 should be performed on Machine B.
E) Job 1 should be performed on Machine A.
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Essay
Correct Answer
verified
View Answer
Essay
Correct Answer
verified
View Answer
Multiple Choice
A) V-T-S-U-R;225
B) U-R-T-S-V;175
C) R-S-T-U-V;240
D) U-S-V-T-R;200
E) R-U-T-S-V;175
Correct Answer
verified
Multiple Choice
A) assigns dates to specific jobs or operations steps.
B) specifies the order in which jobs should be done at each center.
C) assigns jobs to work centers
D) assigns workers to jobs.
E) assigns workers to machines.
Correct Answer
verified
Multiple Choice
A) worker A assigned to job 1 and worker B assigned to job 2
B) worker A assigned to job 2 and worker B assigned to job 1
C) worker A gets both jobs 1 and 2
D) worker B gets both jobs 1 and 2
E) unable to determine
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Multiple Choice
A) lower cost
B) greater use of assets
C) more dependable delivery
D) higher quality
E) added flexibility
Correct Answer
verified
Essay
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Multiple Choice
A) A,B,C,D,E
B) C,E,A,D,B
C) B,D,A,E,C
D) D,A,E,B,C
E) C,E,A,B,D
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
True/False
Correct Answer
verified
Multiple Choice
A) maximum average lateness
B) maximum utilization
C) maximum effectiveness
D) minimum average flow time
E) B and D
Correct Answer
verified
Multiple Choice
A) directly from the aggregate plans.
B) directly from the capacity plans.
C) from inventory records for items that have been used up.
D) from master schedules,which are derived from aggregate plans.
E) from the purchasing plans.
Correct Answer
verified
Multiple Choice
A) begins with a delivery date,then offsets each operation one at a time,in reverse order.
B) has the same meaning as "finite loading."
C) is often used in service environments such as catering a banquet or scheduling surgery.
D) starts the schedule as soon as the job requirements are known.
E) produces a schedule only if it meets the due date.
Correct Answer
verified
Multiple Choice
A) 0.0 days
B) 24.0 days
C) 7.4 days
D) 10.0 days
E) 11.6 days
Correct Answer
verified
Showing 1 - 20 of 116