The benefits of flexible manufacturing systems (FMS) include:


A) reduced labor costs
B) higher flexibility than automation
C) quick changeover from part to part
D) significantly lower unit costs
E) all of the above

F) A) and B)
G) A) and C)

Correct Answer

verifed

verified

Computer-aided manufacturing (CAM) refers to the use of computers in:


A) product design
B) decision making
C) data analysis
D) quality control
E) process control

F) A) and E)
G) B) and D)

Correct Answer

verifed

verified

A cafeteria line would be an example of a process focused layout.

A) True
B) False

Correct Answer

verifed

verified

"Balance delay" is another name for the percentage of idle time in a product layout.

A) True
B) False

Correct Answer

verifed

verified

Given the following data: Given the following data:   Determine the percentage idle time. Determine the percentage idle time.

Correct Answer

verifed

verified


(1.) Compute the st...

View Answer

Which term is most closely associated with cellular manufacturing?


A) part families
B) assembly line
C) robotics
D) CAD
E) CAM

F) All of the above
G) B) and E)

Correct Answer

verifed

verified

Determine the minimum number of workstations needed for this situation: Operating time is 450 minutes per day. Desired output is 80 units per day. The sum of task times is 56 minutes.

Correct Answer

verifed

verified

Which of the following is not a characteristic of layout decisions in system design?


A) substantial investment of both money and effort
B) long-term commitment
C) significant impact on short-term efficiency
D) usually well-received by operative personnel
E) all of the above

F) A) and C)
G) A) and B)

Correct Answer

verifed

verified

Process layouts feature departments or other functional groupings of personnel or equipment.

A) True
B) False

Correct Answer

verifed

verified

If departments X, Y, and Z were to be located in areas I, II, and III, respectively, what would be the total distance (in meters) loads would be moved each week?


A) 4,000
B) 4,500
C) 7,000
D) 8,000
E) 9,000.

F) B) and C)
G) A) and B)

Correct Answer

verifed

verified

If the company desires that output rate equal demand, what is the last task performed at the second workstation in the balance which uses the minimum number of workstations?


A) u
B) v
C) w
D) x
E) y

F) A) and C)
G) C) and D)

Correct Answer

verifed

verified

What is the minimum possible cycle time?

Correct Answer

verifed

verified

For output to equal projected demand, what is the minimum number of workstations needed?


A) 6
B) 4.5
C) 3
D) 2.7
E) 2

F) A) and C)
G) A) and E)

Correct Answer

verifed

verified

What is the layout that will minimize the total distance loads will be moved each week?


A) X in 1; Y in 2; Z in 3
B) X in 1; Z in 2; Y in 3
C) Y in 1; X in 2; Z in 3
D) Z in 1; X in 2; Y in 3
E) Z in 1; Y in 2; X in 3

F) B) and E)
G) A) and E)

Correct Answer

verifed

verified

Without regard to demand, what is the minimum possible cycle time (in seconds) for this situation?


A) 162
B) 72
C) 54
D) 12
E) 60

F) B) and D)
G) C) and D)

Correct Answer

verifed

verified

For output to equal projected demand, what should be the actual cycle time for this production line?


A) 54 seconds
B) 27 seconds
C) 20 seconds
D) 18 seconds
E) 14 seconds

F) A) and B)
G) C) and E)

Correct Answer

verifed

verified

An idle percentage of zero means a line is perfectly balanced.

A) True
B) False

Correct Answer

verifed

verified

Flexible manufacturing systems (FMS) bring the benefits of automation to continuous processes.

A) True
B) False

Correct Answer

verifed

verified

For eight hours of operating time per day and a desired output rate of 960 units per day, what balance (if any) will yield the minimum number of stations?

Correct Answer

verifed

verified

Station #1: t, v, x;...

View Answer

A production line is to be designed for a job with three tasks.The task times are 0.4 minutes, 1.2 minutes, and 0.5 minutes.The maximum cycle time in minutes is:


A) 0.3
B) 0.7
C) 1.4
D) 2.1
E) 0.8

F) A) and D)
G) C) and E)

Correct Answer

verifed

verified