In setting up a kanban control system, you need to determine the number of kanban card sets needed.If the expected demand during lead time is 24 per hour, safety stock is 10 percent of the demand during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what number of kanban card sets is needed? ___________________

Correct Answer

verifed

verified

Using the formula in the textbook, the only parameters we need to determine the number of kanban card sets is the average number of units demanded over some time period, the container size, and the safety stock.

A) True
B) False

Correct Answer

verifed

verified

In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated?


A) Excess quality
B) Overproduction
C) Underproduction
D) Environmental
E) Over-thinking

F) B) and E)
G) C) and D)

Correct Answer

verifed

verified

Which of the following is a lean production technique that has been successfully applied in service firms?


A) Decision trees
B) Leveling the facility load
C) Linear programming
D) Fully utilized capacity
E) Backflushing

F) C) and D)
G) A) and E)

Correct Answer

verifed

verified

Name Fujio Cho's seven prominent types of waste to be eliminated.(1) ___________________ (2) ___________________ (3) ___________________ (4) ___________________ (5) ___________________ (6) ___________________ (7) ___________________

Correct Answer

verifed

verified

(1 Waste from overproduction.(2 Waste of...

View Answer

JIT is typically applied to nonrepetitive manufacturing.

A) True
B) False

Correct Answer

verifed

verified

Lean production is a management philosophy and a pull system throughout the plant.

A) True
B) False

Correct Answer

verifed

verified

Uniform plant loading is a process of smoothing the production activity flow to dampen the reaction waves that normally occur in response to schedule variations.

A) True
B) False

Correct Answer

verifed

verified

As lean production methods reduce changeover and setup times and thus enable smaller economic lot sizes and less work-in-process inventory, is the importance of quality increased or decreased? Why?

Correct Answer

verifed

verified

Increased.The reason for this is simply ...

View Answer

Which of the following is a lean production technique that is not reported in the textbook to have been successfully applied in service firms?


A) Organization of problem-solving groups
B) Upgraded housekeeping
C) Upgraded quality
D) Frozen windows
E) Elimination of unnecessary activities

F) B) and D)
G) A) and B)

Correct Answer

verifed

verified

Which of the following is an element that addresses elimination of waste under lean production?


A) Production ahead of demand
B) Group plant loading technology
C) Kanban production control system
D) Minimized run times
E) Full capacity utilization

F) A) and B)
G) A) and E)

Correct Answer

verifed

verified

One of the aims of value stream mapping to eliminate waste in a process.

A) True
B) False

Correct Answer

verifed

verified

Imagine comparing a manufacturing operation using regular lot-sizing and the same operation with a kanban/lean production approach.What would be your expectations of the difference between the total cost (i.e., inventory holding costs + setup/ordering costs) of each?


A) Inventory holding cost will increase nonlinearly with inventory.
B) Total costs will be lower for the regular lot-size operation.
C) Total costs will be lower for the kanban/lean production operation.
D) The order quantity will be larger for the kanban/lean production approach.
E) As long as the total quantity is the same, total costs will be the same.

F) A) and D)
G) B) and C)

Correct Answer

verifed

verified